Guides

Read your log like a coach

Each guide answers one question lifters actually ask, cites its sources, and links to the tool that does the math for you.

  1. 01 How to Use a Lifting Log (Paper or App) Use a lifting log by writing planned targets before each session, recording actual sets, reps, load and RPE, and reviewing the week every 7 days.
  2. 02 How to Track Progressive Overload (Without Guessing) Track progressive overload by logging load, reps, sets and effort (RPE/RIR) every session, then comparing like-for-like sets week to week.
  3. 03 1RM Formulas Explained: Epley, Brzycki and Lombardi Epley, Brzycki and Lombardi estimate your 1RM from a set of reps. They agree closely below about 6 reps and drift apart above 10. Here is why.
  4. 04 RPE vs RIR: How to Rate and Use Lifting Effort RPE and RIR measure the same thing in lifting: RPE 10 means 0 reps left, RPE 8 means 2. How the scale works, how accurate it is, and how to pick loads.
  5. 05 How to Structure a 12-Week Strength Block A 12-week strength block is usually three 4-week phases: volume, intensity, then peak and test. How to pick lifts, set starting weights, and adjust.
  6. 06 When to Deload: Planned vs Reactive Deload Weeks Deload every 4-6 weeks by plan, or sooner when your log shows stalled e1RM, rising RPE at the same loads, or missed reps. How to run and log one.
  7. 07 How to Estimate Your 1RM Without Maxing Out Estimate your one-rep max from a hard set of 3 to 6 reps with the Epley or Brzycki formula, or from a logged set with RPE, instead of testing a true max.
  8. 08 How Much Weight to Add Each Week: Linear Progression Add 2.5 kg (5 lb) a session on squats and deadlifts and 1 to 2.5 kg on presses once you hit your reps. When to slow down, and what a stall means.
  9. 09 Warm-Up Sets for Lifting: How to Work Up to a Top Set Warm up with the empty bar, then about 40, 60 and 80 percent of the target for 5, 3 and 2 reps, with a single near 90 percent before very heavy sets.
  10. 10 Plate Loading Math: How to Load a Barbell Subtract the bar, halve the rest, build each side from the heaviest plate down: 100 kg on a 20 kg bar is 25 + 15 a side. Plate weights, colours, kg to lb.

The Logbook: one progression check a week

A short weekly email: one thing to check in your log, one technique cue, and new tools and printables when they ship. Free, unsubscribe any time.

We'll email you once to confirm. See the privacy policy.